Implement Industry Ideas
  • Pedestal-mount crane
  • Pedestal-mount crane
  • Pedestal-mount crane

WD80

Article: 00033343

Pedestal-mount crane

Product Details?

Project name: Zhuhai Hengqin No.2 Bridge

Project overview: Zhuhai Hengqin No.2Bridge is divided into South and North Bridge approach and the Hongwan waterwaybridge. The main bridge cross the Hongwan waterway bridge has length of 600m,use 100m+400m+100m three span continuous steel tied arch bridge form withdiffraction width of 36m, both sides cross is different derivation string beam,middle cross is rigid arch steel derivatives tied arch bridge with the flexiblebeam, the height from vault top to the middle fulcrum is 90m. The maindiffraction uses variable high degree "N" distribution, steel archrib cross derivatives is 9m high. The whole bridge uses variable knowsarrangement, and there are 12M, 14m, 16m and other kinds of internode form



Introduction of equipment:

Rated lifting weight: Main hook 80t,auxiliary hook 15t, the whole machine can walk on steel diffraction beam, andcan complete at the same time the side span erecting straight girder and mainarch beam erection, with lifting, luffing, slewing, upper chassis leveling, thewhole machine shift and function of anchorage. After node is placed, it cancomplete the steel erection with different section distance.

Specifications

  • Configuration: pedestal-mount
  • Function: lifting
  • Lift capacity: Min.: 1 kg (2.2 lb)

Other items

In this category | In this category, (ZHEJIANG HEJIAN HEAVY INDUSTRY CO.)

Leave request for price calculation right now, we will send you best prices.